Public Works

OR and WA

BPA Transmission Line Access Roads


Bonneville Power Administration

Project Highlights:

  • Over 1,100 miles of access road improvements constructed or designed
  • Over 50 fish passage culvert designs
  • Various project lengths, from one structure to 60+ miles long
  • Employ a field-heavy design approach

Bandon OR

Bandon - Rogue No. 1 Wood Pole Rebuild


HDR (for Bonneville Power Administration)

Project Highlights:

  • 46-mile H-frame wood pole rebuild
  • 115kV transmission line
  • L-line retracement
  • New structure staking
  • Produced new plan and profile maps

Soda Springs ID

Hooper Springs-Lanes Creek Transmission Line


Bonneville Power Administration

Project Highlights:

  • Survey and mapping for new 33-mile transmission line
  • Surveyed multiple alignment options
  • Cadastral retracement of 36 sections of land
  • Established a project office and relocated employees

Chehalis WA

Chehalis - Raymond No. 1 Wood Pole Rebuild


HDR (for Bonneville Power Administration)

Project Highlights:

  • 18-mile wood pole rebuild project
  • 115kV transmission line
  • L-line retracement
  • LiDAR verification
  • Prepared Access Road Acquisition Requests
  • Delivered our work ahead of schedule despite a tight timeline

OR, WA, ID, MT

Mapping and GIS Support


Bonneville Power Administration

Project Highlights:

  • Creation of new plan and profile maps
  • Updates to existing plan and profile maps
  • Conversion of hand-drawn maps to hybrid digital files
  • Creation of GIS shapefiles
  • Generation of exhibits for acquisition requests

Goldendale WA

Big Eddy – Knight No. 1 500 kV Transmission Line


Bonneville Power Administraton

Project Highlights:

  • Rebuild and replacement of 29 miles of double circuit 500kV transmission line
  • Erection of lattice steel towers
  • Installation of fiber optic cable
  • Construction of new access roads
  • Project included spanning of the Columbia River

The Dalles OR

Celilo DC Converter Station - Pacific DC Intertie Upgrade


Bonneville Power Administration

Project Highlights:

  • Installation of ±560kV bi-polar converter station at the existing Celilo station
  • Station rated at 3,800 MW
  • Civil work including foundations, grading, road, and walkways
  • Engineer-Procure-Construct contract
  • Tight schedule in a physically-constrained area

Walla Walla, Columbia, and Garfield Counties WA

Central Ferry-Lower Monumental No. 1 Transmission Line


Bonneville Power Administration

Project Highlights:

  • Construction of a 38-mile 500 kV transmission line with 159 steel lattice towers
  • Installation of related 28.5-mile and 10,000-foot segments of fiber optic systems from the Lower Monumental Substation
  • Construction of approximately 88 miles of access roads

OR

Celilo-Sylmar No. 1 Transmission Line


Bonneville Power Administration

Project Highlights:

  • Upgrade to 265 miles of the 1,000 kV Direct Current Pacific Intertie
  • Total of 1,204 structures
  • Project split into three (3) sections with multiple contractors
  • Replacement of insulators and supporting hardware, vibration dampers, and dead end compression fittings

Walla Walla County WA

Central Ferry, Lower Monumental, and Lower Snake River Two Substation Upgrade


Bonneville Power Administration

Project Highlights:

  • Upgrades to two (2) main substation and five (5) satellite sites
  • Site development and 500 kV substation equipment installation
  • Installation of Remedial Action Scheme, data, relaying, and control systems
  • Cable trench installation

Umatilla OR

McNary UEC Substation


Bonneville Power Administration

Project Highlights:

  • Rerouting of an existing transmission line from the 230 kV yard to the 115 kV yard
  • Installation of a 230/115 kV 300 MVA power transformer, three (3) 230 kV power circuit breakers, and four (4) 115 kV power circuit breakers

Monroe WA

Monroe Substation Integration


Bonneville Power Administration

Project Highlights:

  • Construction of a new fuse shunt capacitor group at a 500 kV substation
  • Installation of five (5) 500 kV power circuit breakers and two (2) 230 kV power circuit breakers
  • Installation of relay protection and SER/SCADA equipment

Sutherlin OR

Alvey-Fairview No. 1 Wood Pole Rebuild


HDR (for Bonneville Power Administration)

Project Highlights:

  • 99-mile H-frame wood pole rebuild of a 230 kV transmission line
  • MacKay Sposito provided both survey and mapping
  • Performed cadastral and property corner ties
  • Conducted topographic, profile, cross section, and LiDAR verification surveys

Beaverton OR

Keeler-Oregon City No. 2 Right of Way Resolution


Bonneville Power Administration

Project Highlights:

  • Retracement survey and right of way resolution for 22 miles of a transmission line corridor
  • Located over 50 cadastral monuments and over 200 BPA structures to compare the record alignment with the as-built alignment

King County WA

Raver Substation Topographic Survey and Expansion ROS


Bonneville Power Administration

Project Highlights:

  • 42-acre boundary and topographic survey to support substation expansion
  • Survey included 16 acres of dense forest
  • Required additional safety training and BPA escort within energized substation area

Southern WA

Ross-Schultz Fiber Optic Replacement


Bonneville Power Administration

Project Highlights:

  • 356-mile fiber optic replacement project
  • Updated over 500 BPA maps
  • Upgrade of two fiber optic segments
  • Provided LiDAR verification, crossing surveys, pole staking, and geodetic control

Grant County WA

Priest Rapids Hatchery Renovation


Grant County Public Utility District

Project Highlights:

  • Renovated rearing ponds
  • New adult holding, raceway, and pollution abatement ponds
  • Construction of incubation building
  • Installation of instrumentation and controls
  • Two new radon aeration towers

Desert Aire WA

Priest Rapids Downstream Fish Passage


Grant County Public Utility District

Project Highlights:

  • New fish bypass for migrating salmon
  • Modification of three spillways for top spill fish passage
  • Modification to spillway gates and the spillway ogees and aprons
  • Underwater concrete for apron extension
  • Concrete piers extended

Grant County WA

Nason Creek Acclimation Facility


Grant County Public Utility District

Project Highlights:

  • Construction of new 13,000 sf fish acclimation building
  • Eight (8) 30-foot diameter acclimation tanks
  • Water intake structure and piping
  • New 3,200 sf maintenance building
  • New 1,500 sf maintenance and operations staff residence building

Twisp WA

Carlton Acclimation Facility


Grant County Public Utility District

Project Highlights:

  • New fish acclimation facility for up to 220,000 summer Chinook salmon smolts
  • Eight (8) 30-foot diameter fish rearing tanks
  • Extension of river water piping to new building and distribution piping
  • Stormwater treatment

Volitional Fish Passage


Project Highlights:

  • Four (4) major projects worth approximately $100 million
  • Serve as owner’s representative, with inspection and construction management services

Trap and Haul Fish Passage


Project Highlights:

  • Major trap and haul fish passage program worth approximately $80 million
  • Serve as owner’s representative, with inspection and construction management services
  • Heavy civil work, attraction flow pumps and pipes, ladder pools, crowders, and sorting facilities

Dayton WA

Tucannon River Wind Farm


Portland General Electric

Project Highlights:

  • 116-turbine wind farm on 20,000 acres
  • 267 megawatts of total installed capacity
  • 234 miles of 34.5kV underground collection cable
  • 42 miles of access roads
  • 21.5 miles of 230kV transmission line

Grant County WA

Wanapum Monolith Stabilization


Grant County Public Utility District

Project Highlights:

  • Engineering News-Record Northwest’s Energy/Industrial Project of the Year in 2015
  • Quick response survey and inspection work for a spillway crack
  • Established survey control on the dam for use in measurements and drill hole layout

Pend Oreille County WA

Box Canyon Turbine Upgrades


Pend Oreille Public Utility District

Project Highlights:

  • Provided on-site project manager for upgrade of two hydroelectric turbine units
  • Installation of new four-blade runners
  • Replacement of control systems
  • Coordination with global suppliers

Grant County WA

Wanapum Dam Tainter Gate Chain Repair


Grant County Public Utility District

Project Highlights:

  • Refurbishment of 18 Tainter gate chains
  • Replaced over 3,300 chain pins
  • Environmental protections to prevent river contamination

Grant County WA

Priest Rapids Turbine Generator Building


Grant County Public Utility District

Project Highlights:

  • New 18,000 sf building for turbine and generator
  • Tilt-up concrete panel installation
  • HVAC system installed
  • Sewer and water utilities installed

Grant County WA

Wanapum Reservoir Shoreline Stabilization


Grant County Public Utility District

Project Highlights:

  • Shoreline stabilization and restoration at nine sites
  • Half-mile of shoreline restored and stabilized
  • Bio-engineered solution used
  • Local, state, and federal permits obtained

Grant County WA

Priest Rapids Reservoir Shoreline Stabilization


Grant County Public Utility District

Project Highlights:

  • Shoreline stabilization and restoration at three sites
  • 1,000 lineal feet of shoreline stabilized
  • Bio-engineered solution used
  • Woody debris added for sedimentation control

Grant County WA

Priest Rapids Water System


Grant County Public Utility District

Project Highlights:

  • Water system upgrades at Priest Rapids Dam
  • Pump house and vertical turbine pump installed
  • 150’ tall, 250,000-gallon water storage tank
  • Installation of mechanical equipment and controls

Beverly WA

Wanapum Maintenance Center Phase III


Grant County Public Utility District

Project Highlights:

  • 40,000 sf new hydro engineering division building
  • Steel framing and tilt-up concrete wall construction
  • Office space for 120 engineers and support staff

Spillway Gate Rehabilitation


Project Highlights:

  • 26 spillway gates completed
  • Served as the owner’s representative, overseeing the contractor’s work
  • Experience with coatings, welds, structural steel bolt-ups, trunnion repairs, rivets, environmental compliance, and safety

Kennewick WA

Southridge High Pressure Gas Main


Cascade Natural Gas

Project Highlights:

  • New 2.5-mile, 6-inch diameter gas main
  • Will serve thousands of acres of developable land
  • Included siting for a pressure station
  • Designed in coordination with construction of a new arterial street

Vancouver WA

119th Street Gas System Reinforcement


Northwest Natural

Project Highlights:

  • 5-mile, 8-inch gas main to reinforce existing system
  • Performed staking of rights-of-way, easements, and boring locations
  • Performed as-built survey ties and prepared as-built maps

Grants Pass, OR; Roseburg, OR; Lewiston, ID

Cow Creek, Umpqua, and Clearwater Profiles


Williams

Project Highlights:

  • Located three existing gas pipeline crossings
  • Determined depth as well as horizontal location
  • Mapped the creek and river bottoms using a single beam echo sounder
  • Prepared plan and profile maps of each crossing

Whatcom County WA

Dakota Creek Bridge HD Replacement


Cascade Natural Gas

Project Highlights:

  • New 6-inch steel gas main in coordination with a bridge replacement
  • Tight timeline due to bridge construction window
  • Provided surveying, civil design, and permit drawings
  • Prepared legal descriptions for a new DNR lease

Wenatchee WA

Wenatchee River Gas Crossing


Cascade Natural Gas

Project Highlights:

  • New 3,000-foot long steel gas main, including river crossing
  • Performed upland and bathymetric surveys
  • Prepared Record of Survey drawings

Grant County WA

Wanapum Dam Overlook


Grant County Public Utility District

Project Highlights:

  • New scenic viewpoint looking over the Wanapum Reservoir
  • New parking lot
  • Improved ADA access
  • Picnic tables
  • Improvements to the viewing platform

Grant County WA

Wanapum Dam Upper Boat Launch


Grant County Public Utility District

Project Highlights:

  • Complete overhaul of existing boat launch site
  • New launch float
  • Improved parking lot and access road
  • Dredging of ramp toe to accommodate varying water levels
  • ADA improvements

Desert Aire WA

Priest Rapids Recreation Area


Grant County Public Utility District

Project Highlights:

  • Expanded boat basin with 3-lane ramp and float
  • New jetty constructed
  • Expanded parking lot
  • ADA improvements
  • Extensive public involvement and outreach

Pend Oreille County WA

Forebay Recreation Area


Seattle City Light

Project Highlights:

  • Redesign and reconstruction of campground, day use facility, boat launch, and parking
  • New restroom, picnic shelters, and picnic tables
  • 900 feet of shoreline restoration
  • ADA improvements

Grant County WA

Huntzinger Recreation Facility


Grant County Public Utility District

Project Highlights:

  • Improvements to an existing boat launch facility
  • New launch ramp and float
  • Parking lot improvements and ADA upgrades
  • Mitigation and riparian plantings

Grant County WA

Priest Rapids Recreation Area Shoreline Trail


Grant County Public Utility District

Project Highlights:

  • New 3.1-mile long paved shoreline trail
  • Two (2) new trailheads with parking

Vancouver WA

Vancouver Toyota


Vancouver Toyota

Project Highlights:

  • 48,000 sf building
  • 750 parking stalls (primarily vehicle storage and display)
  • LEED Silver certified
  • 5-acre parking lot comprised of pervious pavers
  • Low Impact Development (LID) stormwater control
  • Highly reflective surfaces combat heat island effect

Vancouver WA

The Vancouver Clinic at Columbia Tech Center


The Neenan Company

Project Highlights:

  • 75,000 sf, two-story building
  • Outpatient clinic with associated parking
  • Located within Columbia Tech Center (CTC)
  • Met City of Vancouver and CTC development standards
  • Additional buffering for neighboring residences
  • Civil design, surveying, and permitting / entitlement

Battle Ground WA

The Vancouver Clinic at Battle Ground


The Neenan Company

Project Highlights:

  • 48,000 sf, two-story building
  • Outpatient clinic facility with associated parking
  • Existing Clinic building remained open during construction
  • Phase 1: new building and south parking lot
  • Phase 2: east parking lot and demolition of old building
.

Vancouver WA

The Vancouver Clinic at 87th Avenue


The Neenan Company

Project Highlights:

  • 137,000 sf, three-story building
  • Existing Clinic building remained open during construction
  • Phase 1 –new building and south and west parking lots
  • Phase 2 – east parking lot and demolition of old building

Benton County WA

Red Mountain Center American Viticultural Area


JT Atkins & Company and Benton County

Project Highlights:

  • Federally-designated wine grape-growing region
  • 4,000 acres
  • Utility infrastructure master planning
  • Regional fire suppression system alternatives
  • Wastewater system alternatives
  • Domestic water system feasibility and assessment

Vancouver WA

Riverstone Market Place


Project Highlights:

  • 20 acres
  • Grocery anchor and ancillary commercial
  • 250,000 sf of floor area
  • Located within the Fisher’s Landing Master Planned Community
  • Avoided wetland impacts
  • Civil design, surveying, and permitting / entitlement

Vancouver WA

Nautilus World Headquarters


Nautilus

Project Highlights:

  • 40-acre campus
  • Site reconfiguration for Nautilus
  • 480,000 sf building
  • 1,100 parking stalls
  • Revisions to parking areas
  • Covered 800 parking stalls with all-season outdoor sports fields

Richland WA

Hanford Community Visioning


Tri-City Development Council and Visit Tri-Cities

Project Highlights:

  • Draft vision for future public access to the Hanford Area
  • Decommissioned nuclear production area
  • 586-square mile area
  • Federally-funded project
  • Organized and facilitated open houses and media events

Pierce County WA

Big Sky Neighborhood Park


Newland

Project Highlights:

  • 5-acre neighborhood park
  • Located in Tehaleh master planned community
  • Allows diverse social and recreational opportunities
  • ADA accessible, including accessible swing seats
  • Inclusive design elements
  • Three (3) distinct play areas
  • Sand and water play area for imagination and exploration

West Richland WA

Yakima River Gateway


City of West Richland

Project Highlights:

  • Waterfront park and trail
  • Part of new community gateway
  • Non-motorized river access
  • Environmental and historical interpretation
  • Overlook, trails, entry monuments, urban plaza, and tiered lawn areas
  • Low Impact Development (LID) elements

Portland OR

South Waterfront Greenway


Portland Parks and Recreation

Project Highlights:

  • 3-mile restoration and improvement along Willamette River
  • CM/GC contracting method
  • Construction observed by multiple state and federal environmental agencies
  • Riparian plantings and shallow water refuge for juvenile salmon

Ridgefield WA

Abrams Community Park


City of Ridgefield

Project Highlights:

  • Improvements to an existing 22-acre community park
  • Master planning
  • Open houses and attendance at park advisory board and stakeholder meetings
  • Wetlands, stream buffers, and other environmental constraints accommodated

Beaverton OR

Evelyn Schiffler Memorial Park


Tualatin Hills Parks & Recreation District

Project Highlights:

  • Removed existing park features and a residence
  • Regrading, utilities, playgrounds, basketball courts, skate park, trails, picnic shelter, athletic field, and community and memorial gardens
  • 250-foot boardwalk with observation decks over enhanced wetland

McMinnville OR

Chegwyn Farms Neighborhood Park


City of McMinnville

Project Highlights:

  • 4 acres
  • Former farm
  • Interpretive signs to educate about site’s agrarian heritage
  • Park site annexed into City after master plan approval
  • Playground, skate park, and creative/interpretive play area

Lewis County WA

Ike Kinswa Group Camp Development


Washington State Parks and Recreation Commission

Project Highlights:

  • 20 acres
  • New road, comfort station, tent and RV camping, fire pits, and picnic areas
  • 2,200 feet of trails
  • Designed to Washington State Parks and Recreation Commission standards
  • Protects shoreline and wetland areas and preserves natural landscape

Washington County OR

Waterhouse Trail


Tualatin Hills Park and Recreation District

Project Highlights:

  • 5-mile off-street community trail
  • Planned, designed, and oversaw construction of five (5) trail segments
  • Led team of sub-consultants
  • Trail segments located within environmentally sensitive areas
  • Extensive coordination with almost a dozen agencies

Vernonia OR

Vernonia Parks and Trails Master Plan


City of Vernonia

Project Highlights:

  • Master plan for 177 acres
  • Evaluated properties and assessed opportunities and constraints
  • Established goals based on public outreach, and provided recommendations
  • Conceptual design for multiple parks and trail alignments

Ridgefield WA

Clark College at Boschma Farms


Clark College Foundation

Project Highlights:

  • Future 70-acre campus
  • Assessed five (5) properties for consideration
  • Detailed feasibility analysis and comparison of two (2) finalists
  • Storm drainage basin analysis
  • Coordinated wetland and geotechnical assessments

DuPont WA

Amazon Distribution Center


Duke Realty

Project Highlights:

  • 5 million square-foot facility (1 million square-foot footprint)
  • Over 900 parking stalls
  • Negotiated $500,000 storm drainage system development charge reduction
  • Sormwater facilities designed for both phases

Vancouver WA

Columbia Tech Center


PacTrust

Project Highlights:

  • 500 acres
  • Employment center and mixed-use development
  • Office, light industrial, retail, and residential uses
  • 14-acre central park and amphitheater
  • Reclaimed rock quarry
  • Pedestrian-friendly with extra-wide meandering sidewalks

Washougal WA

Steigerwald Commerce Center


Port of Camas-Washougal

Project Highlights:

  • 127 acres
  • Industrial and business park
  • Adjacent to Steigerwald Lake National Wildlife Refuge
  • Wetlands integrated into the site
  • Master planning, civil design, surveying, permitting / entitlement, and construction oversight

Burbank WA

Burbank Business Park


Port of Walla Walla

Project Highlights:

  • 91 acres
  • Commercial and light industrial park
  • Connections to a Corps of Engineers park and high school ball fields
  • Barge slips and rail access
  • Master planning
  • Conceptual land use plan

Richland WA

Horn Rapids Industrial Park


City of Richland

Project Highlights:

  • Update to existing master plan
  • Additional 1,000 acres of industrial land included
  • Over 10 miles of planned road expansion
  • 259-acre business center expansion
  • 10 to 20-year infrastructure planning

Clark County WA

Clark County Rural Industrial Land Bank


Clark County

Project Highlights:

  • Washington’s first rural industrial land bank
  • Land previously zoned for agricultural use
  • Allows major industrial projects outside urban growth areas
  • Five properties considered
  • Identified locations suited for industrial uses

Vancouver WA

West Vancouver Freight Access - Rail Trench


Port of Vancouver

Project Highlights:

  • Part of West Vancouver Freight Access rail expansion
  • New southern rail line to relieve rail traffic congestion
  • Rail line runs beneath the high water level of the Columbia River
  • Concrete walls protect from the 100-year flood
  • Surveying, utility research, and construction inspection

Vancouver WA

West Vancouver Freight Access – Great Western Malting Demolition


Port of Vancouver

Project Highlights:

  • Part of West Vancouver Freight Access rail expansion
  • Demolished 130-foot tall grain silos, 100-foot tall drum house, sheds, conveyors, sky bridges, and Building 2155
  • Great Western Malting and nearby businesses remained open during demolition

North Bonneville WA

Cascades Business Park


Port of Skamania

Project Highlights:

  • 42 acres
  • Triangular-shaped site
  • Site contained significant fill from Bonneville Dam
  • 80,000 cubic yards of grading
  • 3,000 feet of sanitary sewer main
  • 4,300 feet of water main

Pasco WA

Tri-Cities Airport Business Park


Port of Pasco

Project Highlights:

  • 70 acres
  • Retail, office, and light industrial
  • Master planning
  • Conceptual design for landscaping, public plazas, and frontage improvements
  • Developed landscape guidelines

Vancouver WA

Mission Hills Apartments


Project Highlights:

  • 560-units on 32 acres
  • 5 units per acre
  • 66 buildings
  • Two (2) clubhouses
  • Six (6) existing homes relocated to newly-platted lots
  • Site contained challenging slopes

Kennewick WA

Grandridge Apartments


Courtesy Development

Project Highlights:

  • 160 units on 12 acres
  • 13 units per acre
  • High-end townhouses and apartments
  • 3-acre park
  • Challenging layout for emergency vehicle access

Pierce County WA

Tehaleh


Newland

Project Highlights:

  • 4,700 acres
  • Employment-based planned community
  • 9,700 residential units (single-family and multi-family)
  • 480 acres for employment
  • 380 acres for public facilities
  • Largest active project in Washington

Pierce County WA

Trilogy at Tehaleh


Shea Homes

Project Highlights:

  • 700 lots
  • Multi-phase
  • Located within Tehaleh
  • Age 55+ housing
  • 36% open space
  • 100-foot wide landscape buffer along adjacent arterial street
  • Plat alteration and PUD modification for private clubhouse

Kennewick WA

Creekstone Planned Development


Newland

Project Highlights:

  • 653 lots
  • 217 acres
  • Two (2) neighborhood parks
  • Three (3) miles of trails
  • 30 acres of open space
  • Recreational vehicle storage facility
  • Challenges included Kennewick Irrigation District canal, overhead power lines, and a city reservoir

Vancouver WA

Glenwood Hills Retirement Center


Lifestyles Senior Housing

Project Highlights:

  • 325 units
  • 83-unit loft-style apartments
  • Independent living, assisted living, and memory care
  • Multiple expansions
  • Originally located in multiple jurisdictions
  • Civil design, surveying, and permitting / entitlement

Vancouver WA

The Quarry Senior Living


Lifestyle Senior Housing

Project Highlights:

  • 290-units
  • 360,000 square-foot facility
  • 205 parking spaces
  • Independent living, assisted living, and memory care
  • Located in Columbia Tech Center
  • Former rock quarry
  • Challenging slopes
  • Open space, pedestrian plaza, and pet area

Richland WA

Bella Vista Apartments


Western Heritage

Project Highlights:

  • 225 units
  • 16 acres
  • 14 units per acre
  • Community center
  • Civil design and surveying
  • Construction staking

Vancouver WA

Fisher’s Landing Master Planned Community


Newland

Project Highlights:

  • 2,100 acres
  • 3,300 single-family lots
  • 2,400 multi-family units
  • Commercial and retail
  • 10 parks and one (1) golf course
  • Accommodated existing wetlands
  • Master civil engineering and land surveying consultant

Hillsboro OR

Reed’s Crossing Master Planned Community


Newland

Project Highlights:

  • 464 acres
  • Within the 2,100-acre South Hillsboro Expansion area
  • 4,000 residential units
  • Three (3) schools
  • Comprehensive stormwater, open space, and trail systems

Camas WA

Lacamas Shores


Project Highlights:

  • 170 acres
  • 250 lots
  • Premier residential development overlooking a lake
  • 2-mile portion of public trail
  • Integrated with Camas Meadows Golf Course
  • Steep hillside slopes
  • Private boat launch and park

Various locations in Alaska

Alaska Airport Surveying Projects


Federal Aviation Administration (FAA)

Project Highlights:

  • Survey work at multiple airports, some in remote locations
  • Work related to updating navigational aids

Pasco WA

Tri-Cities Airport DVOR Relocation


Federal Aviation Administration

Project Highlights:

  • Survey support for a DVOR relocation project
  • Prepared engineering drawings for DVOR and SAWS construction plans

Kahului HI

Kahului International Airport Runway 2 Localizer


Federal Aviation Administration

Project Highlights:

  • Survey support for the relocation of a localizer
  • Prepared engineering drawings related to clearing and airspace actions

Juneau AK

Juneau International Airport Runways 8 and 26


Federal Aviation Administration

Project Highlights:

  • Survey support for airport runway lighting systems
  • Survey work included a hydrographic survey and obstruction clearance surveys

Kennewick WA

Clearwater Avenue- Safe Clearwater


City of Kennewick
  • Prepared and maintained the project website
  • Facilitated over two dozen stakeholder meetings
  • Facilitated three (3) public open houses, including a virtual open house
  • Served as the project’s media representatives

Kennewick WA

Hildebrand Roundabout


City of Kennewick

Project Highlights:

  • New roundabout design
  • Challenging design due to steep cross-slope
  • Intersection of Hildebrand and US-395 also redesigned
  • WSDOT intersection approval received

Vancouver WA

SE 1st Street – 164th Avenue to 192nd Avenue


City of Vancouver

Project Highlights:

  • Improvements to an existing two-lane arterial, upgrading it to principal arterial standards
  • Project is being designed as a Complete Street for multi-modal transportation
  • Key features will include a roundabout, separated (protected) bike lanes, and a Dutch intersection

Wilsonville OR

SW Boones Ferry Road – Wilsonville Road to Bailey Street


City of Wilsonville

Project Highlights:

  • Improvements to the only traffic route through the “Old Town” business core
  • Low impact development stormwater rain gardens and pervious pavers utilized
  • New mid-block lighted pedestrian crossing
  • New water main and relocation of existing sewer main

Washington County OR

SW Boones Ferry Road – Day Road to Norwood Road


Washington County

Project Highlights:

  • Improvements to an existing street, widening it to a 3-lane section
  • Designed as a Complete Street to accommodate multi-modal transportation
  • Improvements for approximately 5,000 lineal feet

Kennewick WA

Ridgeline Road Roundabouts


City of Kennewick

Project Highlights:

  • Designed two roundabouts on arterial road for key intersections
  • One two-lane roundabout and one single-lane roundabout
  • Coordinated latecomer agreements and property owner cost sharing

Vancouver WA

SE 192nd Avenue Phase III


City of Vancouver

Project Highlights:

  • New 5-lane principal arterial (3,400 lineal feet)
  • Performed value engineering studies
  • Regional stormwater analysis and design
  • Significant design challenges from a previous quarry operation
  • Sensitive lands mitigation
  • Pedestrian trail with overlook

Portland OR

Sellwood Bridge Replacement


Advanced American Construction

Project Highlights:

  • Replacement of existing 1,900-foot long bridge over the Willamette River
  • Assisted contractor in setting 150 steel piles
  • Surveys involved communication with barge and crane operators

Pasco WA

Argent Road


City of Pasco

Project Highlights:

  • Design of arterial improvements to a 3.5-mile long corridor
  • Project will be a Complete Street for multiple modes of transportation
  • Reconfiguration of existing access points
  • Incorporates low impact development (LID) stormwater methods

Pierce County WA

Cascadia Boulevard Extension and Roundabout


Newland

Project Highlights:

  • 6,200-foot extension of an arterial street within the Tehaleh community
  • 3-lane section with the ability to be expanded to 5 lanes in the future
  • New multi-lane roundabout
  • Multi-use paths on either side of the road

Lower Snake River WA

Central Ferry Fiber Phase II


Bonneville Power Administration
  • Installation of 77 miles of fiber optic cable along existing transmission systems
  • Both overhead and underground fiber optic cable installed
  • Project divided into two (2) segments
  • Overhead optical ground wire and hardware installed

Guide and Exclusion Nets


Various Clients
  • Four (4) significant fish guidance and exclusion net projects
  • Serve as owner’s representative, with inspection and construction management services
  • Experience with inspection using remote operated vehicles and divers

Cowlitz and Skamania Counties WA

Williams Gas Slide Monitoring


Williams
  • Slide monitoring surveying for nine (9) separate sites
  • Project is completed annually
  • Supports preparation of slide monitoring reports

Rufus OR

2.5" Expanded Conductor Replacement Project


Bonneville Power Administration
  • Removal and replacement of 2.5” Expanded ACSR conductor
  • Three (3)-mile section on two (2) 500 kV transmission lines (95,000 feet removed and replaced)
  • An Equi-Potential Zone was constructed for safety and efficient movement in the work area

Vancouver WA

Port of Vancouver Waterfront Utility Improvements


Port of Vancouver
  • First phase of Columbia River waterfront development
  • Deep stormwater, sanitary sewer, and water lines for future extension
  • Transportation Improvement Board funding required quick completion
  • Installed during time of low groundwater levels due to proximity to the Columbia River

Vancouver WA

C-Tran Maintenance Facility Expansion


C-TRAN
  • 16,000-sf expansion of existing maintenance facility
  • Expansion allows greater use of C-TRAN's 6-foot, low-floor, hybrid buses
  • Expansion will house a down-draft paint booth and a new lift
  • Includes parking area expansion

Lewis County, WA

Cowlitz Valley Road Repairs


Federal Highways - Western Federal Lands Division
  • Remote location along the Columbia River
  • Over 5,000 cubic yards of roadway excavation
  • Installed 66” and 72” pipe culvert
  • Installed 9’ span, 8’ rise precast reinforced concrete box culvert

Camas, WA

Camas High School Parking Lot Expansion & Remodel


Camas School District
  • Converted track and field practice area to parking lot
  • Added 81 parking spaces 
  • Removed and replaced the existing water quality swale
  • Included storm drainage system, parking area lighting, and landscape islands with irrigation

Washougal, WA

Jemtegaard Middle School Site Survey


Washougal School District
  • Boundary and topographic survey of the 37-acre 
  • Mapped Evergreen Highway adjacent to the subject site
  • Boundary research, monumentation ties, and calculations 
  • Prepared legal descriptions for a boundary line adjustment 

Camas, WA

Skyridge Middle School Drainage Design


Camas School District
  • Stripped and graded existing track to drain to a nearby catch basin
  • Constructed underdrain to supplement catch basins
  • Designed roof drain and french draining systems 
  • Designed a retaining wall 
  • New athletic field drainage system 
  • Added riprap ditch to the north side of the 

Washougal, WA

Washougal High School Sports Fields Drainage Improvement Study


Washougal, WA
  • Drainage analysis on a failing existing drainage system 
  • Assessed the existing storm system
  • Calculated the hydrologic conditions 
  • Designed the proposed drainage grid

Pacific County, WA

SR105 – Washaway Beach Ortho Photo and DTM


Washington Department of Transportation
  • 4-mile UAV orthomosaic aerial photo survey
  • Stitched together and assigned geographically referenced data points to create a 3D map
  • The hour-long flight provided as much survey data as a ground crew could produce in a week

Eugene, OR

SE Eugene Pipeline Expansion


Northwest Natural
  • Right-of-way to right-of-way topographic mapping
  • Right-of-way resolution, easement descriptions
  • UAV flight with orthomosaic deliverable
  • Preparation of design plan and profile sheet set

Cowlitz County WA

SR503 - Speelyai Bay Road Emergency Landslide Visual Inspection and Modeling


Cowlitz County
• Emergency response UAV services
• Provided an accurate 3-dimensional model of the slide to develop earthwork volumes and plan explosive charges

Vancouver WA

Sifton Elementary School


Evergreen School District
  • Challenging site constraints and phasing due to onsite replacement around an active school
  • GC/CM contract delivery
  • Innovative land use approval strategies
  • Aggressive design and construction schedule

Pasco WA

Columbia Basin College Social Science & World Language Center


Columbia Basin College | MMEC Architecture
  • 65,000 square-foot multi-story building
  • Low Impact Development Stormwater Solution
  • Integrated design into existing parking facilities to reduce impact to campus

Vancouver WA

Sorenson Neighborhood Park


Clark County
  • Inclusive play elements including nature play areas
  • ADA access throughout the park.
  • Naturalized and sustainable water quality and detention facilities.

Bonney Lake WA

Expedition Grove


Newland
MacKay Sposito was hired to develop a vision for and design a 1.5-acre neighborhood park. The park includes a play structure with a rope bridge, swings, a rustic plaza, adventure trails, and a picnic shelter with views of Mount Rainier.   

Port Angeles WA

Washington National Park Pavement Preservation


Federal Highway Administration - Western Federal Lands Division
• Pavement preservation on 33.1 miles of roads and parking areas
• Coordination of project in high traffic tourism area
• Oversight of mobile unit and continuous crew application
• Challenging weather conditions

Estacada OR

Clackamas Highway Pavement Restoration


Federal Highway Administration - Western Federal Lands Highway Division
  • Provide day to day inspection of the project which included submittal of daily progress reports and photos of all activities
  • Took responsibility and the initiative to resolve issues as they arose to keep the project on schedule
  • Verified products/materials being used daily with what was submitted by contractor and approved by the client
  • Delivered project on time and within budget

Bonney Lake WA

The Post at Tehaleh


Newland
  • 3,282 sqft Community Center
  • Epicenter of growing community
  • Two outdoor patios with gas fireplaces
  • Caffé D'Arte

Olympia WA

PCI HealthDev / FMC Lacey


PCI HealthDev
  • 2 acre site with 16,000 sqft building
  • ±70 parking stalls including some porous asphalt stalls
  • Adjacent, existing stormwater pond audit

Bonney Lake WA

Tehaleh Heights Elementary School


Newland
  • Coordination with Sumner-Bonney Lake School District, Pierce County, and a team of consultants
  • Incorporation with the local park and community center to support STEM programming and serve as a focal point of the community

Foresthill CA

Emergency Action Plan Update


Placer County Water Agency
  • Developed a simulation to actively engage with over 30 participants
  • Coordinated logistics with dozens of local, state, and federal agencies
  • Provided actionable recommendations to improve PCWA's EAP

Rufus OR

Big Eddy Relay House


Bonneville Power Administration
  • Brand new building from the ground up
  • Required large underground cable vault with rolling garage door access. The forming of the cast-in-place cable vault was complex, requiring more than 60 conduit entrances
  • Material delays posed a challenge, which the team was able to overcome by rescheduling the work to maintain the completion date

Spokane WA

Post St. Transformer Cooling


Avista
  • Design-Build transformer cooling system replacement
  • Retrofit turn of the century powerhouse & indoor substation
  • Coordination of energized equipment

Portland OR

Morro Bay Substation Hydrology Study, Phase 1


Mason, Bruce & Girard
  • Working to address flooding at a large transmission substation and small distribution substation
  • Preparing existing condition hydrology condition memo

Portland OR

Grace - Oneida Powerhouse and Surge Tank Structure Refurbishment


PacifiCorp
  • Refurbishment of historic powerhouse and surge tank
  • Abatement of hazardous materials
  • Compliance with permits to preserve historical aspects
  • Fiberglass reinforced acrylic coating system

Vancouver WA

Tower and Antenna Bundle Construction


Bonneville Power Administration
  • Instructed the customer telecommunication department in the proper use and procedures within construction and project management software (CAIS)
  • Onsite inspection, documented and reported improper concrete installation resulting in a cost savings for the customer
  • Onsite inspection noted a location during excavation which required additional ground grid, which was later installed, resulting in mitigating step or touch potential
  • Trained the contractor regarding the proper project management procedures to adhere to and which customer personnel to contact when asking contractual or coordinating construction activities

 


Portland OR

Yale Dam Abutment Drilling Construction


PacifiCorp
  • Provided inspection services for two phases of construction
  • Lengthy days to match contractor hours
  • Final closing with little to no corrections

Walla Walla County, WA WA

Wallula 12-Inch HighPressure Gas Pipeline


Cascade Natural Gas

Project Highlights:

  • • 5.8 miles of 12-inch High Pressure Steel Pipe Installation
  • 4,000 linear feet of Horizontal Directional Drilling (HDD)
  • Project included full environmental permitting, critical areas,
    wetlands, Conditional Use Permitting, Right-of-Way permits,
    stormwater permitting, and cultural investigation

Kennewick WA

Bob Olson Parkway and Sherman Roundabout


City of Kennewick

Project Highlights:

  • 2-lane spiral roundabout
  • Worked closely with City of Kennewick traffic engineering group
    and Public Works for viable roundabout concept

Washington County, OR WA

NW CORNELL ROAD - NW 113TH AVE TONW 102ND AVE


Washington County

Project Highlights:

  • Required coordination with
    local property owners for
    the replacement and con- nection of approximately 30
    driveways.
  • Realignment of an offset
    intersection at NW 107th
    Avenue that is at the project
    mid-point requiring installa- tion of a new traffic signal at
    the 107th intersection.

London United Kingdom

Jackson Creek Fish CampCampground


Lorem Ipsum.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. In tincidunt, risus ac eleifend interdum, magna orci porta erat, ac accumsan purus turpis at risus. Maecenas in consequat ipsum. Nulla ac velit et lectus congue consequat ornare nec sapien. Vivamus lacinia sem in rhoncus mollis.

Beaverton, OR OR

CEDAR HILLS PARK MASTER PLAN AND IMPLEMENTATION


Tualatin Hills Park & Recreation District

Project Highlights:

  • Master plan of an existing community park to increase program activities.

Grant County, WA

JACKSON CREEK FISH CAMPCAMPGROUND


Grant County Public Utility District No. 2

Project Highlights:

  • Designed ten view camp sites
  • Included an internal looped road system, a restroom facility, ADA accessible camp sites, and restoration plantings
  • Improved existing use area
  • Preserved vegetation

Tualatin, OR

Capital Paving & ADA Upgrades


Tualatin Hills Parks & Recreation District

Project Highlights:

  • ADA Assessments for parks, trails, parking lots, and public sidewalks
  • Site design and preparation of construction, permitting, and bidding documents
  • Revised District's standard details and specifications
  • Inventory and analysis studies for repair, replacement, and expansion of park and trail improvements

West Richland WA

ADA ASSESSMENT & TRANSITION PLAN


City of West Richland

Project Highlights:

  • Established checklist for evaluating existing conditions
  • Inventoried and analyzed each park site and trail system
  • Summarized barriers and solutions for removal

Hillsboro OR

ADA Transition Plan


Hillsboro Parks & Recreation

Project Highlights:

  • ADA Assessments for over 30 park and recreation facilities
  • ADA Transition Plan serves as guide for planning and implementation of facility modifications over the next 10 years and establishes the methodology for continued improvements beyond the 10-year plan

Camas WA

Test


City of Camas

Project Highlights:

  • Example 1
  • 2
  • 3